BESS - Battery Energy Storage System
Peak Shaving & Load-Shifting
Reducing Peak Load
- Eliminating penalties for exceeding ¼-hour maxima
- Reducing reserved power (HV)
- Lowering the main circuit breaker rating while maintaining the current available power (LV)
- Increasing maximum power while keeping the existing circuit breaker (LV)
- Shifting consumption over time (LV and HV)
- Beneficial even without solar
- Payback period of 2–5 years in locations with frequent ¼-hour maximum exceedances
- Plug&Play, requiring only an electrical cable and a base or floor
- Outdoor and indoor installations
- Maintenance-free, lifespan of up to 10 years, no moving parts requiring service
- Clean, silent, compact - only 1.5 m2
- Reducing your CO2 emissions